Method / Four controlled gates

Less handoff.
More signal.

ForgeLine treats manufacturing as a sequence of decisions that must stay connected—not a chain of departments passing drawings downstream.

Gate 01 / Frame

Name the real constraint.

Function, interfaces, failure cost, volume, timing, and commercial target become one shared brief.

Gate output
Requirements map
People in the room
Customer + manufacturing engineer
Start at this gate ↗
01

Requirements before estimates.

A number without a route is not a production plan.

02

Risk before release.

Known uncertainty can be scheduled, tested, and priced.

03

Evidence before volume.

The first build earns the right to become the repeat build.