03
Capability / Quality systems

Evidence ships
with the part.

Inspection planning that follows the real function of the design—not a generic checklist at the end of the route.

Interactive inspection plan

Click the critical feature.

Each callout carries its own method, sampling frequency, and release priority.

Feature A / Critical

Primary datum plane

Method
CMM plane evaluation
Frequency
First article + every 10th part
Release record
Serialized inspection result
Inspection plan active
DimensionalCMM + vision

Programmed and manual verification

DocumentationFAIR / C of C

Customer-specific release packages

IdentitySerialized

Material and revision traceability

Quality begins at review

Measure the function, not just the print.

The strongest inspection plans mirror assembly interfaces, functional datums, material condition, and risk. That makes the report useful when a program changes.

  • First-article inspection reports
  • Material certifications and C of C
  • CMM and vision-system programming
  • Surface finish and coating verification
  • Nonconformance and revision traceability
Define the release package early.

Put inspection inside the specification.

Open Spec Studio